Camillus Pump Station Force Main Rehabilitation Project - Phase 2
Project generally consists of lining approximately 25,400 linear feet of 24-inch diameter ductile iron force main with a fully structural CIPP liner, installation of 3,000 linear feet of 30-inch force main via horizontal directional drilling, and rehabilitation of existing drainage and air release manholes
Status
Bidding Closed
Prebid Date | 8/28/24 9:30am |
Bid Date | 10/10/24 2:00pm |
Location
Syracuse, NY
Bid Date has been extended to: October 10th, 2024 at 2:00 PM
Updated pre-bid meeting location: 712 Henry Clay Blvd, Liverpool, NY 13088.
Estimated Construction Cost is: $21M
This project requires a non-refundable fee of $220 made payable to Avalon.
Electronic download option available for a non-refundable fee of $49 made payable to Avalon.