Camillus Pump Station Force Main Rehabilitation Project - Phase 2

Project generally consists of lining approximately 25,400 linear feet of 24-inch diameter ductile iron force main with a fully structural CIPP liner, installation of 3,000 linear feet of 30-inch force main via horizontal directional drilling, and rehabilitation of existing drainage and air release manholes
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Addendum 1 4.5 MB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
ongov-117-24a_Addendum_2 8.4 MB
Pre-Bid Meeting Minutes (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Camillus FM Rehab Pre bid minutes_August 28, 2024 412.0 KB