Town of Pavilion Wastewater Treatment Plant - Disinfection Improvements

Construction, installation, and setting-to-work of an external stand-alone gravity-flow ultra-violet (UV) disinfection system to treat effluent discharge from the Town of Pavilion wastewater treatment plant (WWTP) to meet specified standards. The UV installation will include all equipment, civil works, site piping, electrical services, controls, testing and commissioning, fabrication and accessory equipment necessary to provide a fully-functioning system. Project includes installation of a pump station, new structural concrete pad and wood pole cover construction
Addendum 01 (click to expand/collapse)
Order this section for $0.00
This is available for download to registered users. Log in now
Order files below for $0.00 each
Name Size
00 91 13.1 - Addendum No. 1 337.8 KB
Bid Tabulation (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
1678.22002 - T. Pavillion WWTP Disinfection Improvements Bid Tab 17.1 KB
Pre-Bid Meeting Minutes (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
2024.07.17_pre-bid meeting minutes 330.4 KB