Camillus Pump Station Force Main Rehabilitation Project - Phase 2

Project generally consists of lining approximately 25,400 linear feet of 24-inch diameter ductile iron force main with a fully structural CIPP liner, installation of 3,000 linear feet of 30-inch force main via horizontal directional drilling, and rehabilitation of existing drainage and air release manholes

Status

Bidding Closed

Prebid Date 8/28/24 9:30am
Bid Date 10/10/24 2:00pm

Company & Contacts

CHA Consulting Inc.
Matthew Abatto  

Location

Syracuse, NY

Bid Date has been extended to: October 10th, 2024 at 2:00 PM


Updated pre-bid meeting location: 712 Henry Clay Blvd, Liverpool, NY 13088.


Estimated Construction Cost is: $21M


This project requires a non-refundable fee of $220 made payable to Avalon.

Electronic download option available for a non-refundable fee of $49 made payable to Avalon.