Town of Farmington - NYS RT 332 & Collett Road, and Mertensia Road Watermain Replacement

Project involves the replacement of the existing 8" watermain along NYS Route 332 & Collett Road with approximately 1,850 LF of 12" and 8" PVC watermain, 280 LF of directionally drilled HDPE watermain, valves, hydrants, and appurtenances. Project also includes the replacement of the existing 8" watermain along Mertensia Road near Elizabeth Way with approximately 700 LF of 10" PVC watermain, valves, hydrants, and appurtenances

Status

Bidding Closed

Prebid Date7/22/24 2:00pm

Bid Date7/31/24 10:00am

Company & Contacts

MRB Group
David Herman  
(585)-381-9250

Location

Intersection of NYS Route 332 & Collett Road, and Mertensia Road near Elizabeth Way

This project requires a non-refundable fee of $90 made payable to Avalon.

Electronic download option available for a non-refundable fee of $49 made payable to Avalon.