City of Oneonta Market Street Improvements Phase 1: Demolition Project

The Project consists of the demolition of an existing three (3) level parking garage, two (2) CMU stair towers, CMU Trailways building within the garage, and Water St. Extension bridge, stabilization of retaining wall on the south side of Water Street utilizing low density cellular concrete fill, hazardous materials removals, construction of a new 3-sided permanent retaining wall at the southeast corner of Water Street, and miscellaneous electrical, and utility work, located at 47 Market Street in Oneonta, NY.
Addendum 01 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Oneonta Mkt St. Transp Improv DEMO Phase 1 - Addendum 1 230815 63.0 MB
Addendum 02 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Oneonta Mkt St. Transp Improv DEMO Phase 1 - Addendum 2 230818 17.0 MB
Addendum 03 (click to expand/collapse)
This is available for download to registered users. Log in now
Name Size
Oneonta Mkt St. Transp Improv DEMO Phase 1 - Addendum 3 230823 8.5 MB